Welcome! Log In Create A New Profile Recent Posts
Deer in Yosemite

The Moon is Waxing Gibbous (82% of Full)


Advanced

Valley Road Closures - Update

All posts are those of the individual authors and the owner of this site does not endorse them. Content should be considered opinion and not fact until verified independently.

avatar Valley Road Closures - Update
March 11, 2009 01:52PM
March 12, 2009 - Northside Drive re-closes between the El Cap Picnic area and the El Cap Cross for grinding and repaving operations. This will be a 'hard closure' meaning there will be no vehicular, bicycle or pedestrian access on the roadway surface. The segment of Northside Drive between Camp Four and the El Cap picnic area will remain closed until the roadway surface has been ground down and repaved. We expect to have this roadway back no later than Memorial Day weekend.

March 19, 2009 - Northside Drive between the Curry Four Way Intersection and Camp Six ("River Straight"winking smiley will temporarily carry two (2) way traffic until Southside Drive between the Sentinel Bridge crossover and the Curry Four Way Intersection ("Housekeeping Straight"winking smiley is ground down and repaved. We expect to have "River Straight" back to one way westbound traffic with a special use lane no later than Memorial Day weekend.

March 19, 2009 - Southside Drive between the Sentinel Bridge crossover and the Curry Four Way Intersection ("Housekeeping Straight"winking smiley will be ground down and repaved/curbed. There will be a 'hard closure' at Sentinel and Southside for eastbound access (meaning there will be no vehicular, bicycle or pedestrian access on the roadway surface). There will be an established "Bike Path Detour" with signage. DNC employee, service vehicle access to Housekeeping Camp and deliveries may be made via the Curry Four Way thru the west end of the closure. Please use caution, observe lane discipline and lower your speed to 10 MPH in the construction zone. We expect to have this roadway back to two lane, one way traffic eastbound no later than Memorial Day weekend.

There will be additional large construction vehicles on our roadways during these time periods - please use extra caution when encountering these vehicles.

Sorry, only registered users may post in this forum.

Click here to login