Traffic: flagging about 1/4 mile above the Big Oak Flat Tunnel

All posts are those of the individual authors and the owner of this site does not endorse them. Content should be considered opinion and not fact until verified independently.

avatar Traffic: flagging about 1/4 mile above the Big Oak Flat Tunnel
August 10, 2009 01:54PM
The Half Dome View contractor on HWY 120 (Allison Sierra) will be controlling/flagging traffic into one lane on the 12th, 13th and 14th of Aug. The flagging operation will take place about 1/4 mile above the Big Oak Flat Tunnel on HWY 120 [actually that's not highway 120 there] at the Half Dome View project site. Traffic will be flagged into the uphill lane with the downhill lane closed off for construction (asphalt paving of parking lot).