All posts are those of the individual authors and the owner
of this site does not endorse them. Content should be considered opinion
and not fact until verified independently.
Water lines are being replaced from the Crane Flat Gas Station to the Crane Flat Water Tank. Expect delays up to 20 minutes at the Big Oak Flat / Hwy 120 Tioga Road intersection through mid-November.