North and Southside Drive Rehabilitation

All posts are those of the individual authors and the owner of this site does not endorse them. Content should be considered opinion and not fact until verified independently.

avatar North and Southside Drive Rehabilitation
March 24, 2008 03:38PM
April 7th thru April 17th: Southside Drive will be closed between Sentinel Bridge and the west end of Housekeeping (Access to Housekeeping, Leconte Memorial, Curry Village, and Campgrounds will be via Northside Drive.) Northside Drive between Camp-6 Intersection and Curry Village will become 2-way traffic during this 10-day detour. Also, Southside Drive will remain open between Curry Village and Housekeeping with 2-way traffic. During this closure crews will be placing culverts on this segment of Southside Drive.

March 24th thru April 4th: There will be intermittent one lane traffic control on Southside Drive between Housekeep and Pohono Bridge as crews are surveying and placing rock (Less than 15-minute delays). Crews on Northside Drive are placing culverts and today they will begin grinding up the existing asphalt in preparation for paving.

Sorry, only registered users may post in this forum.

Click here to login