South Fork drainage (7.5 miles east of Crane Flat), August 20 - 29 asphalt will be removed and repaved in the westbound lane. Drive carefully the next couple of days as material is delivered. Please observe posted speed limit signs and traffic control measures. Delays will be less than 30 minutes.