All posts are those of the individual authors and the owner
of this site does not endorse them. Content should be considered opinion
and not fact until verified independently.
11/10 and 11/12 Asphalt removed for pipe work behind the Happy Isles Nature Center. Area will be covered with metal plates during pipe work and then other base material for the winter.